Pre- Panelised offsite construction
Fast & accurate with zero waste, saves time material and cost
BIM: Full BIM details available
CE Marked: Up to execution Class 4
High performance: Both thermal and acoustic performance & fire protection
ETA: European Technical Assessment status as standard
www.metsec.com – 01216016070